Single Ticket

Paste one ticket as JSON and run the local rules assessment.

Local rules

Workbook Import

Analyze workbook rows client-side. Nothing is uploaded back to this site.

Browser import

Supported headers include Ticket, Address, Status, Notes, Called In, Valid, Renew, Expire, and Usic Marked.

Results

Ready.

Cloud page No Outlook sync

Analyzed

0

Critical

0

High

0

Due Today

0

Load a sample ticket or import a workbook to generate results.

Positive Response Statuses

Use these Sunshine 811 status groups as a quick reference while reviewing field conditions and closeout language.

Reference

Marked

  • 1 Marked
  • 2A Marked with exceptions, high-profile utility and site surveillance
  • 2B Marked, but similar private facilities may also exist
  • 2C High-priority subsurface installation in conflict
  • 2D High-profile utility in conflict, contact utility for details
  • 2E Marked within the white-lined area only

Unmarked

  • 3A No access to property
  • 3B Incorrect address information
  • 3C On-site meet arranged
  • 3D High-profile utility, surveillance contact pending
  • 3F Marking delay agreed with excavator
  • 3H Private facilities may exist on property
  • 3M Marking instructions unclear
  • 3N Locate description insufficient, white lining required
  • 3P Utility lacks accurate locate information
  • 3R Excavation already performed
  • 3T Extraordinary circumstances
  • 3U Not the service provider for that location
  • 3W Utility work agreement in place

Other

  • 4 Clear, no facilities
  • 5 No conflict with requested work area
  • 6A Active facilities present for demolition notice
  • 8 Ongoing job with scheduled marking arrangement